Sector |
Project |
Client
[project executed via company] |
Scope of Project |
Period
|
| Semi-conductor |
Freescale Semiconductor |
[Acuity] |
The KLFM plant is based on a dual 132kV Intake from TNB.
Evaluation of Voltage Sags and Harmonic issues at the KLFM Plant and comparative evaluation with Freescale plants in US and China.
Includes recommendations on P.Q. mitigation measures. |
2010 |
| O&G |
Shell Refining Company |
[Acuity] |
Training on Lightning Protection, Surge Protection, Grounding & Bonding, and EMC installation practices. |
2010 |
| Rail |
Northern Double Tracking Project |
[Acuity] |
This double tracking railway project is from Ipoh to Padang Besar and is based on a 25kV AC Traction System.
Responsible for E&B and EMC for both horizontal and vertical integration across all sub-systems. |
2010 |
| Semi-conductor |
Infineon Technologies, Melaka |
Infineon
[Shanu Perunding] |
Resolution of EMI |
2009 |
| Rail |
RapidKL LRT – Kelana Line Rail-Car Expansion Project |
SCOMI
[GLTM] |
Mitigation measures employed to improve the existing grounding system of a Traction Power Sub-Station |
2009 |
| Rail |
RapidKL LRT – Kelana Line Rail-Car Expansion Project |
SCOMI
[GLTM] |
Evaluation of Grounding System in respect of EMI in Subang Depot Area |
2009 |
| Rail |
RapidKL LRT – Kelana Line Rail-Car Expansion Project |
SCOMI
[GLTM] |
Survey of the existing Grounding System of a Traction Power Sub-Station |
2009 |
| Rail |
RapidKL LRT (formerly known as PUTRA LRT) |
RapidKL
[GLTM] |
Lightning Protection Survey of the Control Building at the Subang Depot |
2009 |
| Rail |
STAR LRT Upgrade |
Halcrow
[ACUITY] |
Lightning Protection & EMC Performance Specification |
2009 |
| Rail |
BHP Billiton (Australia) – RPG Upgrade |
BHP Billiton
[Ansaldo-STS
Australia] |
Evaluation of the existing Lightning Protection System for the upgrade of the Communication Facilities as a part of the RPG Upgrade programme. |
2009 |
| Rail |
KTMB Ipoh-Padang Besar 25kV AC Double Tracking Railway Project |
[ACUITY] |
Commissioned by Balfour-Beatty Ansaldo-Systems STS JV to provide long-term Consultancy Services in respect of lightning protection, surge protection, grounding and bonding, and EMC.
Two Work packages completed to-date:
- Concept Design
- Technical Guideline
|
2009 |
| IT |
Data Centre |
[ACUITY] |
Resolved significant tripping issues at a large scale data centre. |
2008 |
| IT |
Data Centre |
[ACUITY] |
Resolved significant tripping issues at a large scale data centre. |
2008 |
| Broadcast |
Major Broadcast Operator in Indonesia |
[Shanu Perunding] |
Detail Design from the perspective of EMC, Lightning Protection, Surge Protection, Grounding & Bonding. |
2008 |
| Rail |
Pilbara Rail – Australia |
Pilbara Rail
[Ansaldo-STS Australia] |
Lightning Protection Survey of the Pilbara Iron Railway Signalling System |
2008 |
| Power |
TNB – Master Regional Control Centre |
TNB
[In-Control-Tech |
Investigation of the existing control centre set-up and design, supply, install and test the Functional Grounding System incl. the Power Supply Surge Protection requirements. |
2008 |
| Rail |
KTMB – RIDT - Ansaldo-Signal Malaysia |
ANSALDO (MAL)
[Acuity] |
Trouble shooting – Lightning Protection, Surge Protection, Grounding. |
2008 |
| OTHERS |
DUMEX |
DUMEX
[Acuity] |
Investigate and recommend ESD mitigation measures |
2008 |
| Broadcast |
MEASAT-3, Satellite Telemetry Tracking & Command Centre, & DTU Broadcast Facility, CyberJaya |
MBNS
[Acuity] |
Power Quality Review |
2008 |
| Others |
Review of Lighting Surge Protection & Grounding for a Cable Car System. |
GLTM
[Acuity] |
Trouble shooting – Lightning Protection, Surge Protection, Grounding. |
2008 |
| Aviation |
Review of Lighting Surge Protection & Grounding for a Radar System. |
GLTM
[Acuity] |
Trouble shooting – Lightning Protection, Surge Protection, Grounding. |
2008 |
| Rail |
KTMB – RIDT - Ary-Tomen |
ARY-TOMEN
[GLTM] |
Trouble shooting – Lightning Protection, Surge Protection, Grounding. |
2007~2008 |
Broadcast |
ASTRO All Asia Broadcast Centre
|
ACUITY |
Investigation of the existing set-up, and design, supervision and testing for the refurbishment works of the ASTRO AABC facility in respect of High Frequency Grounding, Electrical Noise Management, Lightning & Surge Protection. |
2007~2008 |
Rail |
Ansaldo-Signal Malaysia |
ACUITY |
Trouble shooting – Lightning Protection, Surge Protection, Grounding. |
2007 |
Rail |
Ansaldo-Signal India |
ACUITY |
Establish Documentation on Grounding Lightning & Surge Protection & EMI |
2007 |
Rail |
Anasaldo-Signal India |
ACUITY |
Technical Audit on Grounding & Lightning Protection |
2007 |
Aviation |
KLIA – Siemens- BHS
Power Quality of Power Supply System at KLIA |
ACUITY |
PQ |
2007 |
OTHERS |
Malaysian Institute of Nuclear Technology [MINT]. |
ACUITY |
PQ Audit & Troubleshooting |
2007 |
O&G |
South Angsi Offshore O&G Platform
Assessment of Power Quality during start-up at end of a Turn-Over period – from Black Start to Gas Turbine take-over. |
Talisman Energy
[GLTM] |
Technical Audit on Grounding & PQ. |
2007 |
Broadcast |
National Space Agency, Sg. Lang |
NSA
[ACUITY] |
Trouble Shooting - PQ |
2007 |
Broadcast |
NTV7, Bukit Besi |
NTV7
[GLTM] |
Trouble Shooting |
2007 |
Broadcast |
Broadcast Facility in Bursa Saham, Exchange Square, KL for an International Broadcast company. |
ASTRO-NDTV
[ACUITY] |
Design |
2007 |
Broadcast |
MEASAT Broadcast Network Systems at Cyberjaya |
MBNS
[Acuity] |
Power Quality |
2007 |
Rail |
Modernisation of the Signaling System for KFW 25kV Railway Project between New Delhi and Mughalsarai (40 stations) |
Ansaldo-Signal India
[Acuity] |
Technical Audit, Design Review, Training, Detailed Design |
2006~2007 |
O&G |
South Angsi Offshore O&G Platform |
Talisman Energy
[GLTM] |
Technical Audit on Grounding & Power Quality |
2006 |
Rail |
KLIA Express |
eMAS
[GLTM] |
Technical Audit & on-going Consultancy |
2006 |
Rail |
KTMB Rawang Ipoh Double Tracking Electrification Project |
Siemens
[GLTM] |
Technical Audit |
2006 |
Rail |
KTMB Rawang Ipoh Double Tracking Electrification Project |
Union Switch & Signal
[GLTM] |
Testing |
2006 |
Rail |
KTMB Rawang Ipoh Double Tracking Electrification Project |
UEM Builders
[GLTM] |
Testing |
2006 |
Broadcast |
Broadcast Facility in KLCC for an International Broadcast company. |
Al Jazeera International
[NDY] |
Design, Supervision, Testing |
2005~2006 |
Satellite Ground Station |
Ground Station Antennae, Baseband Equipment for the Satellite Telemetry Tracking & Command Centre, Sg. Lang, Banting |
ESPATIAL
[ACUITY] |
Design, Supervision, Testing & Commissioning |
2005 |
Building |
National Planetarium |
National Space Agency
[DOM Ind.] |
Technical Audit & Power Quality |
2005 |
Building |
Sri Mas Condominium, Cheras |
Amber Resources
[GLTM] |
Technical Audit |
2005 |
Satellite Ground Station |
Measat-3 Satellite Telemetry Tracking & Command Centre, & DTU Broadcast Facility, CyberJaya |
Binariang Satellite Systems
[DOM Ind.] |
Design, Supervision, Testing & Commissioning |
2004~2005 |
Satellite Ground Station |
Satellite Telemetry Tracking & Command Centre, Sg. Lang, Banting |
National Space Agency
[DOM Ind.] |
Design & Supervision,
Testing & Commissioning |
2004~2005 |
Rail
|
Kuala Lumpur International Airport Electric Rail Link |
eMAS
[GLTM] |
Technical Audit & on-going Consultancy |
2004~2005 |
Rail
|
KTMB Rawang Ipoh Double Tracking Electrification Project |
DRB-Hicom
Union Switch & Signal
Siemens Transportation
Balfour Beatty
Bombardier
ADTranz
[GLTM] |
Design, Testing of Stations / Sub-Stations and on-going Consultancy |
2005
2004
2001-2004
2003-2004
2003-2004
2002
2000-2001 |
O&G |
Bock Valve & Metering Stations |
Petronas Gas Berhad
[SAFF TASS]
[BPE] |
Technical Audit, Design, Supervision, Testing & Commissioning |
2003-2004 |
O&G |
PABX System |
Petronas Integrated Petrochemical Facilities
[BPE] |
Technical Audit, Design |
2004 |
Cellular |
Maxis - Performance Improvement Design Team |
MAXIS PIT
[GLTM] |
Design & Technical Recommendations |
2004 |
Aviation |
Aviation Fuel Facility |
KAF, Butterworth, Penang
[SAFF TASS] |
Technical Audit |
2003 |
Petrochemical |
Petrochemical facility |
Cognis, Oleo Chemicals
[Blue Digital] |
Technical Audit |
2003 |
Electrical |
Independent Power Producer |
Northern Utility Resources
[DOM] |
Technical Audit |
2003 |
Rail |
Tanjung Pelepas Rail System |
Ircon International
[GLTM] |
Technical Audit, Design |
2003 |
Rail |
KTMB Phase-1DoubleTracking Electrification Project |
KTMB
[GLTM] |
Technical Audit ~ Problem Resolution |
2003 |
Rail
|
Proposed KTMB Ipoh-Padang Besar Double Tracking Rail |
Ircon International
[GLTM] |
Preliminary design |
2003 |
Radar |
Undisclosed |
Undisclosed
[GLTM] |
Technical Audit, Design |
2003 |
O&G |
Gas Processing Plant 5&6 |
Petronas Gas Berhad
[BPE] |
Technical Audit & Testing |
2003 |
Cellular |
Numerous Sites |
Celcom
[Blue Digital] |
Design, Supervision |
2002-2003 |
Aviation |
Aviation Fuel Facility |
KAF, KLIA
[SAFF TASS] |
Technical Audit |
2002 |
Rail |
Putra LRT, Main Control Centre, Subang |
PLRT
[GLTM] |
Technical Audit, Design |
2002 |
O&G |
CUF Kertih |
Petronas Integrated Petrochemical Facilities
[Electroserve] |
Technical Audit |
2002 |
O&G |
Gas Processing Plant 5&6 |
Petronas Gas Berhad
[Electroserve] |
Technical Audit |
2002 |
O&G |
BASF, Gebeng |
BASF
[Electroserve] |
Technical Audit |
2002 |
O&G |
PABX System |
Petronas Permata
[DOM] |
Technical Audit, Design Supervision, Testing & Commissioning |
2002 |
Industrial |
Newspaper Printing Facility, Glenmarie |
STAR Publications
[GLTM] |
Technical Audit, Design Supervision, Testing & Commissioning |
2001-2002 |
Rail |
Light Rail Transit – Track Side Equipment |
STAR LRT
[GLTM] |
Technical Audit, Design Supervision, Testing & Commissioning |
2001 |
O&G |
Petlin Refinery, Kertih |
Petlin
[SAFF TASS] |
Technical Audit |
2001 |
Rail |
Putra LRT Train Stations – Kelana Jaya, Sri Rampai |
Putra LRT
[GLTM] |
Technical Audit, Design Supervision, Testing & Commissioning |
2000 |
Rail |
Light Rail Transit, Main Control Centre, Ampang |
STAR LRT
[GLTM] |
Technical Audit, Design Supervision, Testing & Commissioning |
1996 |
Radar |
Undisclosed |
Undisclosed
[GLTM] |
Technical Audit |
1995 |
| O&G |
Oil Refinery |
Petronas Penapisan Melaka
[GLTM] |
Earth Testing |
1995 |