FEATURED PROJECTS: ELECTRICAL

Keppel II Merlimau Cogen II Power Plant, Singapore

SINGAPORE

 

Technical audit of EMC AND Lightning Protection installation measures.

 

Hulu Terengganu Hydroelectric Project LOT EM1

 

Conducted soil resistivity measurements down to a depth of 70 meters comprising Residual Volcanic Soil, Weathered Volcanic Rock, and Fresh Volcanic Rock.

TNB - Master Bangsar Regional Control Centre

 

Investigation of the existing control centre set-up and design, supply, install and test the Functional Grounding System incl. the Power Supply Surge Protection requirements.

Copyright 2019, Acuity Systems Consultants Sdn Bhd. All Rights Reserved.