FEATURED PROJECTS: RAILWAYS

Name of Project: Jakarta LRT

Indonesia

(LRT, 750VDC, 3rd Rail System)

Assignment Project Employer: PT Len

Engaged by PT LEN to provide consultancy services in respect of:

  • Establishment for the Main Contractor Wika, a Project Wide (Systems & Infra) Earthing & Bonding and Lightning Protection Strategy document, with due consideration of stray current risks;

  • EMC, E&B, and Lightning & Surge Protection associated with the complete Communications Work Package and SCADA, including technical support in respect of interfaces and integration with other work package contractors;

  • Providing on-the-job training/mentoring/tutelage to the Client EMC (incl. Lightning) - E&B Team, including providing informal training to the sub-contractors of the Client in respect of EMC, E&B, and LV Power Distribution;

  • Subsequently requested by PT Len to:

    • Lead the 3rd Rail Team to close-out outstanding technical matters during the Design Phase;

    • Lead the Blue Light System Team in the Design, Procurement, Construction, Installation, Testing & Commissioning Phases.

 

Name of Project: KVLRT3

(LRT, 750VDC, 4 Rail System)

Assignment Project Employer: MMSB Sdn Bhd

Engaged by MMSB Sdn Bhd to provide consultancy services in respect of Earthing & Bonding and Lightning Protection for the INFRAstructure aspects for the Western Corridor of the project.

Name of Project: KVMRT2

(LRT, 750VDC, 3rd Rail)

Assignment Project Employer: CCCC-GK JV

Engaged by CCCC-GK JV to provide the EMC Management Plan for Trackwork, Maintenance Vehicles, & Works Train.

 

Name of Project: KVMRT2

(LRT, 750VDC, 3rd Rail)

Assignment Project Employer: HAP Consortium (POSCO Engg)

Engaged by HAP Consortium (POSCO ENGG.) to provide the EMC Management Plan for Depot Equipment.

Name of Project: Ampang Line Extension Project

(LRT, 750VDC, 3rd Rail)

Assignment Project Employer: George Kent Lion Pacific JV

Engaged by George Kent Lion Pacific JV (GKLPJV) to provide long-term Consultancy Services.

Responsible for the horizontal and vertical integration of Earthing & Bonding, EMC, Lightning & Surge Protection across the complete railway spectrum of Signalling, Communications, Traction Power Stations, Over-Head Equipment, including integration with Infrastructure Works.

Scope of Consultancy:

  • EMC Management Plan;

  • Lightning & Surge Protection and EMC Installation Guidelines;

  • Integrated E&B Plan comprising requirements of Signalling, Traction Power, Stray Current Management, Trackwork, and integration with that of Lightning Protection and Infrastructure Earthing;

  • Designed the Integrated Earthing & Bonding Plan for the KKSB Depot, including assessment of the associated risks, including that of stray currents;

  • Review and advise on technical matters related to Stray Current Management;

  • EMC Coordination Services within SYSTEMS and at the Interfaces with Other Parties (including LRV);

  • Interface with the Employers Representative and Detailed Design Consultant;

  • Review of EMC related submissions and processes;

  • Review of EMC Control Plans of sub-contractors;

  • Large Grid Earth Resistance Testing (High Current Injection), EPR, S&T, and Transferred Potentials, complete with Test Plans, Testing, and Test Reports;

  • EN 50121-2 Emission tests - Background RF Emission, 'SNIFF' tests in existing equipment rooms, complete with Test Plans, Testing, and Test Report (characterisation of environment);

  • EN 50121-2 RF Emission Measurements - Railway as a Whole complete with Test Plans, Testing, and Test Report;

  • EMI tests in respect of near field inductive pick-up on cables;

  • Technical Support including trouble shooting.

Name of Project: Overlay Signalling Project - Rio Tinto – Pilbara Rail

Australia

(Diesel)

Assignment Project Employer: ASTS Australia

Engaged by ASTS Australia to review and recommend Earthing and Lightning Protection measures for the Overlay Signalling System project
 

Name of Project: Kelana Jaya Line Extension Project

(LRT, 750VDC, 4 Rail System)

Assignment Project Employer: ARUP Singapore

Engaged by ARUP Singapore to provide the following Consultancy in respect of Lightning & Surge Protection and EMC Installation Guidelines for the project.

Subsequently engaged by ARUP Singapore to carry out an Earthing System Analysis in respect of MV & LV Faults at traction power substations and passenger stations, impact assessment at interfaces with other structures (existing stations/TPSS, third parties, stations of other railways), as well as the approach to bonding of HV and LV cable sheaths. The analysis also included that of transient equipotential bonding. CDEGS was used for the analysis. 

Activities also included interface discussions/reviews and presentations with the Employer's Representatives and Detailed Design Consultants.

Name of Project: Kelana Jaya Line Extension Project

(LRT, 750VDC, 4 Rail System)

Assignment Project Employer: Konsortium CMC-COLAS-UNIWAY

Engaged by Konsortium CMC-COLAS-UNIWAY (KCCU) to provide the following Consultancy and Testing Services.

  • EN 50121-2 Emission tests - Background RF Emission, 'SNIFF' tests in existing equipment rooms, complete with Test Plans, Testing, and Test Report (characterisation of environment);

  • EN 50121-2 RF Emission Measurements - Railway as a Whole, complete with Test Plans, Testing, and Test Report;

  • General technical support in respect of Lightning & Surge Protection, and Earthing & Bonding.

 

Name of Project: Ampang Line Phase-I & II Rehabilitation Project

(LRT, 750VDC, 3rd Rail)

Assignment Project Employer: GLTM Sdn Bhd

Engaged by GLTM to review the tendered requirements, existing set-up of Phase-I and Phase-II, and redesign of the rehabilitation measures for the complete (existing) Ampang Line LRT in respect of Lightning Protection, Surge Protection, Earthing & Bonding including the Ampang Control Centre and Administrative Building, Stations, Traction Power Sub-Stations, Depots, Warehouse and Maintenance Halls, including equipment along the Guideway/Wayside.

 

Name of Project: Ipoh Padang-Besar 25kV AC Double Tracking Project

(25kVAC)

Assignment Project Employer: Balfour-Beatty Ansaldo-Systems STS JV

Engaged by Balfour-Beatty Ansaldo-Systems STS JV (BBASJV) to provide long-term Consultancy Services.

Responsible for the horizontal and vertical integration of Earthing & Bonding, EMC, Lightning & Surge Protection across the complete railway spectrum of Signalling, Communications, Traction Power Stations, Over-Head Equipment, including integration with Infrastructure Works.

This project has some significant differences when compared to previous KTMB Electrified Double Tracking projects. The NDT project has Berapit Tunnel which is of very high soil resistivity posing unique E&B issues, and the Prai Swing Bridge which is the first of its kind in Malaysia.

Scope of Consultancy:

  • Carrying out of numerous System Integration discussions with all team leaders within BBASJV, the proprietary sub-contractors, and the INFRA Contractor (MGJV);

  • Leading and supporting the BBASJV team in the determination of requirements with the Governments Consultants (KSET), to establish baselines to facilitate studies to be undertaken by BBASJV proprietary international sub-contractors, and external specialist consultants;

  • Established several documents, sourced from documents sourced within BBASJV, documents from other external consultants, and documents from Acuity. They are the SYSTEMS Lightning & Surge Protection Measures document (which included EMC installation techniques), the Common Earthing & Bonding Philosophy document, and a Cable Management document (to mitigate risks due to traction currents);

  • Significant contribution to elaborate the EMC requirements and its documentation, including technical discussions with KSET;

  • Close liaison with the BBASJV proprietary sub-contractors and KSET, to identify and define the E&B requirements, and to establish the E&B Study Report;

  • Significant technical support on matters relating to E&B, EMC, Lighting & Surge Protection Measures, and Grounding, to the BBASJV team and the proprietary sub-contractors;

  • Established a Verification Matrix to identify key design requirements from all the documents mentioned above;

  • Carried-out several rounds of verification exercises with all proprietary sub-contractors to ensure that the E&B and EMC requirements have been incorporated in their designs and drawings;

  • Carried-out several rounds of reviews at the fabrication stage, to ensure that the intents of the design drawings had been followed through;

  • Established an E&B & EMC Issues Register to track design issues pertaining to E&B and EMC that had been omitted or that needed refinement;

  • Testing of Large Earth Grid Resistance of TPSS - Test Plan, Testing, Test Report;

  • EMC Coordination and Close-Out;

  • Technical Support including trouble shooting.

 

Name of Project: Ampang Line Extension Project

(750VDC, 3rd Rail)

Assignment Project Employer: Halcrow

Engaged by Halcrow to review the Lightning Protection aspect of the Tender Submissions.

 

Name of Project: Kelana Jaya Line - Rail-Car Expansion Project

(LRT, 750VDC, 4 Rails)

Assignment Project Employer: GLTM Sdn Bhd

Significant mitigation measures employed to improve the existing grounding system of a Traction Power Sub-Station.

 

Name of Project: Kelana Jaya Line - Rail-Car Expansion Project

(LRT, 750VDC, 4 Rails)

Assignment Project Employer: GLTM Sdn Bhd

Resolution of EMI faced by the Signalling System (Induction Loop) at Subang Depot Area. This was traced to near field effects caused by unbalanced conducted currents in the rails.

 

Name of Project: Kelana Jaya Line - Rail-Car Expansion Project

(LRT, 750VDC, 4 Rails)

Assignment Project Employer: GLTM Sdn Bhd

Survey of the existing Grounding System of a Traction Power Sub-Station

 

Name of Project: Putra LRT, Main Control Centre, Subang

(LRT, 750VDC, 4 Rails)

Assignment Project Employer: GLTM Sdn Bhd

Lightning Protection Survey of the Control Building at the Subang Depot, including write-up of mitigation measures.

 

Name of Project: Ampang Line Extension Project

(750VDC, 3rd Rail)

Assignment Project Employer: Halcrow

Engaged to develop the Lightning Protection Performance Specification.

 

Name of Project: BHP Billiton – RPG Upgrade

Australia

(Diesel)

Assignment Project Employer: ASTS Australia

Evaluation of the existing Lightning Protection System for the upgrade of the Communication Facilities as a part of the BHP Billiton RPG Upgrade programme.

 

Name of Project: Rio Tinto-Pilbara Railway

Australia

(Diesel)

Assignment Project Employer: ASTS Australia

To investigate, and recommend mitigation measures to alleviate lightning related problems faced by the mining company's railway signalling system.

 

Name of Project: Existing Indian Railways

India

(25kVAC)

Assignment Project Employer: ASTS India

The initial phase of the works involved the technical audit of existing MicroLok II Signaling Systems in Bangalore, Calcutta, and New Delhi.

Based on the findings of the audit, there were several technical discussions on improvements in terms of immunity to Lightning & Surges, EMC, minimizing cost of grounding, and reducing theft of materials.

Established Design Documentation on Grounding Lightning & Surge Protection & EMC

Several training sessions were then conducted in Bangalore, Calcutta and New Delhi. Technical Audit on Grounding & Lightning Protection

 

Name of Project: KFW - Modernisation of Railway Signaling

India

(25kVAC)

Assignment Project Employer: ASTS India

This project comprises the Modernisation of the Signaling System for KFW 25kV Railway Project between New Delhi and Mughalsarai, India (a total of 40 stations).

Scope of Consultancy:

  • The initial phase of the project involved the technical audit of existing MicroLok II Signaling Systems in Bangalore, Calcutta, and New Delhi. Based on the findings of the audit, there were several technical discussions on improvements in terms of immunity to Lightning & Surges, EMC, minimizing cost of grounding, and reducing theft of materials.

  • Several training sessions were then conducted in Bangalore, Calcutta and New Delhi. 

Carried out a detailed design of the Lightning Protection, Surge Protection, Grounding, Bonding, and EMC for the New Delhi Mughalsarai Project.

 

Name of Project: KTMB Rawang-Ipoh Double Tracking Project

(25kVAC)

Assignment Project Employer: GLTM Sdn Bhd

The Railway Industry has proven to be particularly challenging in that its sub-systems such as Signalling and Interlocking systems, Signal Post Telephone systems, SCADA systems, Passenger Information Systems, CCTV & Security systems, Automatic Fare Collection systems, and Communications Systems are significantly exposed, over large geographical area to lightning, transients and related EMI issues. This results in significant lightning damage to equipment, power supply trips, and ‘signalling disturbances’ resulting in train delays, etc.

Engaged by GLTM Sdn Bhd to provide technical support to the numerous international SYSTEMS contractors of the project.  The services rendered included Outline Design, Earth Resistance & Surge Impedance Testing of Stations / Sub-Stations, as well as trouble shooting and recommendation of mitigation measures in respect of Lightning Protection, Surge Protection, Grounding & Bonding, and EMC Installation Measures.

 

Name of Project: Kuala Lumpur International Airport Electric Rail Link

(25kVAC)

Assignment Project Employer: Express Rail Link (ERL) Sdn Bhd

Technical Audit and problem resolution related to Lightning Protection, Surge Protection, Grounding, EMI. Works included mitigation measures in respect of 'pick-up' of lightning related disturbances by the Axle Counter-Evaluator Systems.

 

Name of Project: KTMB Tanjung Pelepas Rail System

(25kVAC)

Assignment Project Employer: GLTM Sdn Bhd

Technical Audit, Design – Lightning Protection, Surge Protection, Grounding.

Name of Project: Putra LRT, Main Control Centre, Subang

(750VDC, 4 Rails)

Assignment Project Employer: GLTM Sdn Bhd

Technical Audit, Design – Lightning Protection, Surge Protection, Grounding.

 

Name of Project: STAR LRT

(750VDC, 3rd Rail)

Assignment Project Employer: STAR LRT

Technical Audit, Design Supervision, Testing & Commissioning in respect of Stray Current issues at Viaduct areas.

 

Name of Project: PUTRA LRT

(750VDC, 4 Rails)

Assignment Project Employer: GLTM Sdn Bhd

Technical Audit, Design – Lightning Protection, Surge Protection, Grounding of the Kelana Jaya and Sri Rampai Stations.

 

Name of Project: STAR LRT

Assignment Project Employer: GLTM Sdn Bhd

The primary equipment room (ground floor, Main Control Centre) for the about to be commissioned STAR LRT project was facing numerous lightning related problems. Carried out a technical audit, redesigned the surge protection and grounding system, supervised the mitigation works, and tested the completed works.